The Challenge

  • US 33 extension project
  • Complex design-build scope
  • Structural integrity concern

The proposed extension of US 33 project for the West Virginia Department of Transportation, Division of Highways (WVDOH) consists of a four-lane divided highway between Kerens in Randolph County and Parsons in Tucker County.

This design-build project involves the design, construction and financial services necessary for constructing the proposed roadway of approximately 2.86 miles. In August 2019, the survey team recorded movement of Pier 1 at Bridge 5 of approximately 16 inches relative to where it had been constructed.

All work activities were stopped at Bridge 5 pending further investigation. Allen Marr, Ph.D., P.E.,D.GE, NAE, F.ASCE was asked to provide his expertise and review of pier movements.

The Solution

Geocomp developed a monitoring plan, coordinated site investigation, determined the depth of sliding surfaces and developed alternatives for remedial measures. Geocomp engineers continuously monitored sensors to determine the depth of sliding and reviewed piezometer data for changes in the groundwater table of the slope.

From the site data and sensor measurements, Geocomp engineers determined the cause of the pier movement. Eight cross sections along the roadway were examined to determine what was needed to stabilize the mountainside and remove the threat to the safety of the new bridge. Extensive analyses were performed on each of the eight sections to calculate the factor of safety for slope stability.

The analyses included back calculation of the shear strength parameters along the shear plane corresponding to a factor of safety of 1 for the current conditions. The most economical solution was determined to be the combination of the stabilizing berm, lowering the water table in the slope and installing tiebacks in some areas.

Services Provided

Site Investigations

Determine the depth of sliding surfaces and develop alternatives

Determine Cause of Movement

Extensive analyses performed to calculate factor of safety for slope stability

Shear Strength Analysis

Back calculation of the shear strength parameters along the shear plane

Related Projects

GEOPROJECT_Zakim Bridge

Zakim Bridge

Value Delivered:

Monitoring system detected movement and initiated
project alerts
Automated data logging allowed for multiple daily
readings in critical or restricted construction areas
GEOPROJECT_MBTA Gloucester Commuter Rail

MBTA Gloucester Commuter Rail

Value Delivered:

Automated data system resulted in 80% cost savings
to the client
Automated text and email alerts to stop trains if
excessive movement is detected
GEOPROJECT_Route 9w Over CSX_S-scan

Route 9w Over CSX

Value Delivered:

Geocomp provided deep Vs profile results with powerful
low-frequency processing
Our seismic data acquisition was quick, with minimal
human involvement and zero traffic disruption.