The Challenge

  • The movement of the adjacent existing tunnel was a concern due to the unbalanced earth load of the excavation
  • Excavation in variable consistency ground is suspect to unexpected behavior, such as sudden deformation or ground collapse

The addition of Maynard H. Jackson International Terminal at Atlanta’s Hartsfield-Jackson International Airport required the expertise of various companies and professionals. As part of the expansion, the Automated People Mover (APM) trains needed to be extended from Concourse E to the new international terminal.

The Solution

The project team chose a proactive and cost-effective approach to managing the open-cut excavation of twin tunnels using Geocomp’s iSiteCentral® real-time monitoring program. The system provides early warnings of unacceptable or surprise performance in time so that protective measures can be implemented to stop the undesirable performance or reduce the consequences.

Services Provided

Performance Monitoring

Real-time performance monitoring during construction

Risk Reduction

Enabling a proactive and cost-effective approach to managing risk

Related Projects

GEOPROJECT_Second Ave Buildings

Second Avenue Buildings

Value Delivered:

Established integrity of buildings by identifying limiting
and threshold values for various construction activities
Ensure baseline conditions to gauge the effects of
construction on adjacent properties
GEOPROJECT_I-93 South Station

I-93 South Station

Value Delivered:

Analyses and risk assessment showed a better performing
project with less risk than original contract method
Saved the owner $60,000,000 in claims
GEOPROJECT_Eillis Square Parking Garage

Ellis Square Parking Garage

Value Delivered:

Real-time performance monitoring provided essential data
for assessing deformation during construction

Ready to Speak
with our
Experts