The Challenge

  • GTX tasked with soil analysis for export cable route
  • Route carries energy from offshore to onshore substation

GeoTesting Express (GTX) was brought in to determine the soil properties along the proposed export cable route (ECR) that will transport the energy from the offshore substation to the substation on shore.

The Solution

GeoTesting Express provided geotechnical laboratory testing services on over 1,000 meters of vibracore soil samples collected along the proposed ECR. In addition to the laboratory testing services, GTX provided sample pickup/ transportation from various locations in Rhode Island, New York, and New Jersey. GTX also provided Haley & Aldrich access to laboratory space and workstations for their representatives to observe the core splitting activities and aid in the preparation of their core logs.

The testing program consisted of geotechnical tests for index/classification, corrosion, and strength testing. Tests included: moisture content, pH, organic content, specific gravity, grain size, Atterberg limits, density, calcium carbonate, thermal conductivity, minimum and maximum density, direct shear, and UU triaxial tests.

Services Provided

Geotech Analysis

Full suite of geotechnical laboratory testing

Core Analysis

Vibracore logging/sampling

Regional Sample Logistics

Provided sample pick-up and transportation from various locations in RI, NY, and NJ

Related Projects

GTX_PROJECT_Quarry Hills Recreational Complex

Quarry Hills Recreational Complex

Value Delivered:

Ability to provide client with timely sample pick up and
test results
In-house Laboratory Information Management System
(LIMS) allowed GTX to handle and track the large number of
samples
Permeability testing maximized the utilization of low-cost
materials from the CA/T projects
GTX_PROJECT_Quincy Dam

Quincy Dam Reconstruction

Value Delivered:

Highly qualified field personnel to perform quality
assurance oversight
Streamlined the entire lab testing process and provided
much quicker results while meeting USACE and ASTM
requirements
GTX_PROJECT_South Hartford Tunnel

South Hartford Tunnel

Value Delivered:

Quick turnaround testing as each phase of the field
boring program was completed
Complete capabilities: all testing performed in one
laboratory