The Challenge

  • Retaining wall supported on soft clay of Presumpscot Formation
  • Construction below sea level
  • Sloping bedrock
  • Exposure to sea water

Betsy’s Cove retaining wall is located in in the town of Brooksville, Maine supporting Coastal Road or RT 176. The existing slope is protected by granite blocks placed at 1H:1V slope.

The rip-rap measures about 10 feet high and 140 feet long. The existing rip‐rap slope has shown some signs of distress such as settlement along the edge of the existing parking lot, and pavement damage due to voids behind the rip-rap slope. The rip-rap slope is proposed to be replaced with a retaining wall using the existing granite blocks as well as additional redi-rock blocks to supplement the on-site material.

New roadside parking areas will be built on top of the backfill supported by the new retaining wall. The geotechnical challenges include retaining wall supported on soft clay of Presumpscot Formation, construction below sea level, sloping bedrock, and exposure to sea water.

The Solution

Geocomp coordinated and completed the boring program in the tidal influence zone of Betsy’s Cove as well as specialized laboratory tests on undisturbed samples of soft clay. Geocomp engineers also performed analysis for the proposed retaining wall, including a stability analysis and geotechnical recommendations for construction of a replacement wall.

Services Provided

Tidal Zone Investigation

Field investigation in tidal zone with limited access

Engineering Analysis

Engineering analysis of retaining wall including slope stability

Recommendations

Provided recommendations for retaining wall in marine environment

Lab Testing

Specialized lab testing on soft clay of Presumpscot Formation

Related Projects

GEOPROJECT_I-93 South Station

I-93 South Station

Value Delivered:

Analyses and risk assessment showed a better performing
project with less risk than original contract method
Saved the owner $60,000,000 in claims
GEOPROJECT_Branford Bridge

Replacement of Branford Bridge

Value Delivered:

Provided oversight of soil nail wall construction to ensure
project safety
Assessed wall and abutment movements to confirm the
stability was unaffected by construction
GEOPROJECT_Corridor H

Corridor H Bridge

Value Delivered:

Determined the cause of the pier movement
Monitoring showed ongoing movement driven by
groundwater
Geocomp’s stabilization method proved cost-effective