The Challenge

  • Control excavation and tunneling work with minimal impact on surrounding structures
  • Assess design for safety
  • Verify structural performance

Los Angeles Metro awarded the $1.3 billion contract to Walsh/Shea Corridor Constructors (WSCC) to build the Crenshaw/LAX Transit Corridor Project, an 8.5-mile light rail that runs between the Expo Line on Exposition Boulevard and the Metro Green Line at LAX Airport. It included eight new stations, five at grade level and three cut-and-cover braced excavations.

The Solution

Geocomp provided instrumentation and monitoring for over one mile of twin bored tunnels, three cut-and-cover/station excavations, and one low excavation location. Geocomp’s iSiteCentral® integrated data from more than 2,000 sensors, including automated MPBXs, inclinometers, strain gages, and tilt meters with settlement measurements and performance data from the contractor’s Tunnel Boring Machine (TBM) and Automated Motorized Total Stations (AMTS).

iSiteCentral® also incorporates installation documentation and photos into the database to better centralize all instrumentation information and make it readily accessible for reporting and review.

Geocomp focused on the open cut excavations directly adjacent to heavy commercial activity and interconnected with twin-bored 20-ft diameter tunnels, which run 60-ft directly below Crenshaw Boulevard. The construction activity is continuously monitored to help the contractor control excavation/tunneling work and to mitigate risk of unexpected movement to adjacent buildings and utilities.

Services Provided

Construction Monitoring

Real-time data to evaluate construction effects on tunnels and excavations

Structure Safety

Risk mitigation for surrounding structures throughout construction

Geotechnical Solutions

Instrumentation, monitoring, subsurface investigation, geotechnical soil testing, and GIMS

Related Projects

GEOPROJECT_Second Ave Subway

Second Avenue Subway

Value Delivered:

Instrumentation and monitoring during demolition
provided project alerts safeguarding buildings and utilities
surrounding the site
GEOPROJECT_World Trade Center

World Trade Center

Value Delivered:

Real-time monitoring enabled continuous tunnel and
wall deformation detection during construction
GEOPROJECT_Regional Connector

Regional Connector

Value Delivered:

Reduce risk to general public and building owners during
construction activity
Sensor data allowed construction activity to progress
continuously without delays