The Challenge

  • MWAA launched a $78.5 million project in 2000
  • Project aimed to replace mobile lounges with an underground train system
  • Real-time deformation monitoring with 24/7 internet data access specified

In 2000, the Metropolitan Washington Airport Authority (MWAA) implemented its most ambitious capital construction campaign to date. The $78.5 million West Domestic Tunnel Corridor project supports an automated airport train system, which runs underground and connects the main terminal with the midfield concourses and replaces the mobile lounges currently in use. The detailed specifications called for real time deformation monitoring with data made available through the internet.

The specifications called for optical monitoring targets mounted on buildings structures, support of excavation and tunnel linings, with fully automated motorized total stations with a measurement precision of 1mm for sight distances up to 100m, with wireless data links to control site. The system needed to operate 24/7 and the real-time data had to be available on the internet.

The Solution

Geocomp developed a link between the Geodetic Monitoring Software (GeoMoS) system which controls the survey network and Geocomp’s iSiteCentral® online data collection and presentation system. Geocomp created a secure IP link between the iSiteCentral® SQL database and SQL database used by the GeoMoS system. Data added to the GeoMoS system was automatically loaded into the iSiteCentral® database from which the web pages created reports.

The work was completed within two weeks of notification to start, and enabling web access to real time instrumentation data from the Dulles site.

Services Provided

Monitoring Deployment

Instrumentation installation

Information Visualization

Data aggregation, reduction and display

Secure Dataflow

Developed the secure link transmitting real-time data from survey to presentation system

Related Projects

GEOPROJECT_Atlanta International Airport

Atlanta International Airport

Value Delivered:

Reduced risk by monitoring unexpected performance
during construction
Enabled proactive and cost-effective approach to
managing risk by implementing a data management system
that showcases early warnings of unacceptable performance
GEOPROJECT_Honolulu Airport

Honolulu Airport

Value Delivered:

University of Hawaii used the data for student research
and continues to do so for the new few years
GEOPROJECT_Logan Airport

Logan International Airport

Value Delivered:

Real-time data allowed for informed decision making,
reducing delays
Supported maximum required compaction without
unnecessary delays

Ready to Speak
with our
Experts?