The Challenge

  • Honolulu Airport upgrades taxiways with coldplaning method
  • Three-inch removal of existing asphalt for replacement
  • Hawaii DOT assesses structural response to aircraft loading

The Honolulu Airport underwent a major construction effort to resurface existing taxiways. As part of that effort, the resurfacing method of coldplaning (the controlled removal of the surface layer of existing pavement) was evaluated. This required the removal of existing flexible (asphalt) pavement to a depth of three inches and replacement with a new asphalt wearing course surface layer. The Hawaii Department of Transportation (DOT) wanted to evaluate the performance of this method by measuring structural response to airplane loading and various aircraft wheel configurations.

TBD

The Solution

Geocomp worked with the Hawaii DOT to develop project-specific instrumentation specifications, which outlined specific type pavement sensors, data collection requirements, and a triggered camera to capture aircraft wheel configurates to correlate with the measured data. The monitoring system implemented by Geocomp included: 56 Geocomp Asphalt Strain Gages to measure pavement strains under aircraft wheel loads in existing cold-planed surface and new surface layer; Two Geocomp temperature trees to measure temperature gradients in existing cold-planed surface and new surface layer; Stand-alone, solar powered, remotely accessed data acquisition system that can be triggered for data collection based on sensor response or airplane presence; Triggered, low-light camera system to document type of aircraft and wheel configuration to correlate with measured data.

TBD

Services Provided

System Management

Training to University of Hawaii in system operation and data management

Instrumentation Specification

Development of instrumentation specification for HIDOT

Pavement Sensors

Provided Geocomp pavement sensors

Remote Camera System

Design and installation of remote, solar powered data collection system with triggered camera

Related Projects

GEOPROJECT_Dulles International Airport

Dulles International Airport

Value Delivered:

Real-time performance monitoring provided essential
data for assessing deformation/movement during construction
Automated data logging allowed for multiple daily
readings in critical or restricted construction areas
Seamless integration of GeoMoS and iSiteCentral®
GEOPROJECT_Atlanta International Airport

Atlanta International Airport

Value Delivered:

Reduced risk by monitoring unexpected performance
during construction
Enabled proactive and cost-effective approach to
managing risk by implementing a data management system
that showcases early warnings of unacceptable performance
GEOPROJECT_Logan Airport

Logan International Airport

Value Delivered:

Real-time data allowed for informed decision making,
reducing delays
Supported maximum required compaction without
unnecessary delays

Ready to Speak
with our
Experts