The Challenge

  • EPA’s Pownal Tannery: 55,000 cubic yards of contaminated sludge disposed safely
  • Generated from tanning operations between 1937 and 1988
  • Stabilized into a landfill, with surface repurposed for town recreation

The U.S. EPA’s Pownal Tannery Superfund Site in North Pownal, Vermont, required the environmentally safe and structurally sound disposal of 55,000 cubic yards of sludge, contaminated with oils, solvents, lead, and chromium. The sludge had been generated by tanning operations between 1937 and 1988, whereby raw discharges were poured into waste lagoons abutting the Hoosic River in Vermont. Cleanup efforts called for the dense, but structurally weak sludge to be stabilized and compacted into a consolidation landfill. The surface of the landfill was to be used for recreation facilities for the Town of North Pownal.

TBD

The Solution

GeoTesting Express (GTX) conducted the “shake-down” testing, as well as quality control testing throughout the project. “Shake-down” testing had to be completed within one week in order to maintain that the landfill would be constructed on schedule. Sludge properties and required construction operations prevented representative samples from being taken using standard sampling techniques. Subsequently, unconfined compressive strengths measured in the laboratory were frequently below the strength criteria. GTX proposed a modified (laboratory-measured) unconfined compressive strength requirement, as well as alternative test methods, the results of which would more accurately correlate to the true in-field strengths. GeoTesting Express’ engineering support and quickness in providing solutions to critical challenges allowed the project team to move the Pownal Tannery Superfund project forward, on schedule and under budget.

Services Provided

Tailored Testing

Customized test methods to meet project requirements

EPA Assurance

Engineering support to assure US EPA acceptance

Shakedown Testing

Initial “shake-down” testing within tight time constraints

Related Projects

GTX_PROJECT_Safe Harbor Dam

Safe Harbor Dam

Value Delivered:

Provided safe transportation of fragile 90 year old rock
core from job site to lab
Worked closely with client and dam engineer to produce
the best quality data with limited rock cores
GTX_PROJECT_South Hartford Tunnel

South Hartford Tunnel

Value Delivered:

Quick turnaround testing as each phase of the field
boring program was completed
Complete capabilities: all testing performed in one
laboratory
GTX_PROJECT_Catskill Delaware Aqueduct

Catskill Delaware Aqueduct

Value Delivered:

Worked closely with the client to select samples and
develop a test program that met the evolving project needs
Provided test results within three weeks of the
completion of each group of test borings