The Challenge

  • Replacing a three-span to a two-span bridge
  • Demolishing two bridge piers to build a center bridge pier
  • Soil nail walls for support

The Connecticut Department of Transportation replaced a major bridge in Branford, CT that carries I-95 over US Route 1. The three-span bridge was replaced with a new, two-span bridge. The existing pile abutment foundations were re-used for support of the new bridge.

The project also involved the demolition of the two existing bridge piers and construction of a new center pier, widening and lowering the existing Route 1 roadway. Soil nail walls were used to support the existing abutments and provide space for roadway widening.

The Solution

Geocomp is the geotechnical engineer of record for the bridge replacement project. The roles performed by Geocomp on this project included geotechnical design recommendations of the new center piers, re-use of the abutment foundations, soil nail walls, and associated earthwork and dewatering.

The team of engineers provided the design, coordination, and supervision of an extensive subsurface investigation program, bearing capacity and settlement calculations for the new center pier foundations, in addition to abutment pile axial and lateral loading analyses. GeoTesting Express also partook in the project providing geotechnical laboratory testing of collected soil and bedrock samples.

Services Provided

Feasibility Assessment

Performed feasibility assessment of retaining wall for roadway widening

Capacity Analysis

Analyzed capacity of existing abutment foundations to allow for re-use

Lab Testing

Geotechnical laboratory testing of soil and bedrock samples

Related Projects

GEOPROJECT_Bayonne Bridge

Bayonne Bridge

Value Delivered:

Monitor construction effects in real time
Continuously assess bridge health for public safety
GEOPROJECT_Bayou Lafourche Bridge

Bayou Lafourche Bridge

Value Delivered:

Provided ongoing monitoring for the client to understand
structural performance
Performed a load test of the bridge structure prior to bridge
opening to test for safety
GEOPROJECT_Accelerated Bridge Program

Accelerated Bridge Program

Value Delivered:

Minimize the probability and consequences of
adverse events
Maximize the probability and consequences of
positive events