The client needed to evaluate the condition of a dam built across the Susquehanna River in 1930. The only option for determining the properties of the rock under the dam was to test the rock core drilled in 1928 from the original dam design report.

TBD

The Solution

GeoTesting Express (GTX) worked with the client and the dam consultant from Parsons Brinckerhoff to design a testing program that would produce the most appropriate results with the limited amount of core available. To ensure the limited amount of core made it safely, we arranged for GTX to pick up the rock core at the site and hand deliver it to our lab. All the core was of a non-standard diameter, and we had to re-tool our equipment to perform testing on specimens of this size. The tests were completed on these fragile samples within the project specifications.

Rock tests performed:

  • ASTM D2936 Direct Tensile Strength of Rock
  • ASTM D7012C Uniaxial Compressive Strength of Rock
  • ASTM D5084 Flexible Wall Permeability
TBD

Services Provided

Design

Testing program design

Testing

Rock testing

Related Projects

Rock samples

Access to Regions Core

Value Delivered:

Received, processed, and stored a large quantity
of samples
Dramatically reduced costs through automation and
process efficiencies
GTX_PROJECT_Salt Waste Processing Facility

Salt Waste Processing Facility

Value Delivered:

On-time completion of intense, time sensitive $250,000
testing program
GTX_PROJECT_South Hartford Tunnel

South Hartford Tunnel

Value Delivered:

Quick turnaround testing as each phase of the field
boring program was completed
Complete capabilities: all testing performed in one
laboratory