The Challenge

  • Assess existing building conditions
  • Develop repair designs for structures alongside Second Avenue Subway construction

The New York City Metropolitan Transit Authority required survey, evaluation, and design services for 110 buildings located along and adjacent to Second Avenue between 63rd and 86th Streets. The purpose of this assignment was to document the condition of the existing buildings and to design repair details for the structures (as necessary) in conjunction with the construction of the Second Avenue Subway.