The Challenge

  • Puerto Rico’s first public transit project aimed to tackle San Juan’s traffic congestion
  • The project built a 10.7-mile heavy rail system with 16 stations linking San Juan and its urban area
  • December 2004 saw the inauguration of Tren Urbano, featuring electric trains on various tracks

Due to the ever spiraling traffic congestion problems faced by San Juan and surrounding urban areas, the Puerto Rican Department of Transportation and Public Works initiated its first-ever public transportation project in 1996. This project involved building a 10.7mile (17.2-km), 16-station heavy rail system connecting San Juan and the urban vicinity. Electric trains operate on a series of above-ground, below-ground, and surface tracks. The Tren Urbano metro system opened to the public in December 2004.

TBD

The Solution

GeoTesting Express (GTX)’s challenge was to provide rapid, highend geotechnical testing services, as well as engineering support for various engineering firms working on this project. GTX conducted testing, including various strength determinations (consolidations; UU, CU and CD triaxial shears; unconfined compressions; and direct shears) and permeability tests in support of design efforts. Throughout this project, testing results were required to be on an immediate basis.

Despite being over 2,000 miles away, six different engineering firms in Puerto Rico turned to GeoTesting Express because of its fast turnaround times and ability to consistently produce quality results that our clients trust and upon which they could base their engineering decisions. Our clients also benefited from our professional technical support, assisting them in dealing with complex aspects of the unique soils encountered on the job.

Services Provided

Soil Testing

A full suite of soil tests (strength, compression, shear, permeability)

Related Projects

GTX_PROJECT_Pueblo Viejo Gold Mine

Pueblo Viejo Gold Mine

Value Delivered:

Our fast turnaround, high quality and competitive pricing
saved our client thousands of dollars in delays
GTX_PROJECT_Rocky Mountain Arsenal

Rocky Mountain Arsenal

Value Delivered:

Monitoring system detected movement and initiated
project alerts
Automated data logging allowed for multiple daily
readings in critical or restricted construction areas
GTX_PROJECT_Nuclear Power Plant

Nuclear Power Plant

Value Delivered:

Monitoring system detected movement and initiated
project alerts
Automated data logging allowed for multiple daily
readings in critical or restricted construction areas